R & D
Design parameters→Perform design calculations→Calculation of valve model specifications→Actuator Selection→Carry out design
Carry out design including
1. Calculate the product: check the flow rate, pipe diameter, strength, etc.
2. 3D modeling
3. Imported into analysis software for meshing
4. Apply load constraints according to the parameters
5. Stress analyses
6. Contingency analysis
7. Improved design based on analytical strength calculations
8. Produce engineering drawings
Manufacturing & Quality Control
-
Raw Material
• Raw materials (including welding consumables) shall be purchased from suppliers in our AVL qualified as per the Procurement Control Procedures.
• Special materials shall be ordered as per specifications issued for procurement and inspection.
• All incoming raw materials shall be tested according to the Inspection & Test Control Procedures. -
Welding & Heat Treatment
• Welder qualification, welding materials, WPS and welding records, etc. shall be implemented according to the Welding Quality Control Producdures.
• Heat treatment process, records and process control shall be according to Heat Treatment Control Procedures.
• Post-welding heat treatment inspection shall be carried out in accordance with the Welding Inspection Control Procedures.
Inspection & Testing
In-House Laboratory
• Spectrometer
• Metallographic analyzer
• Heating furnace
• Chemical analyzer
• Trace element analyzer
• Ultrasonic flaw detector
• Endoscope
• UT detector
• Spectrum analyzer
• Various chemical & mechanical
• Mmicroscopic testing
• Temperature, revolution, vibration, noise, spectrum detection
• Valves of various calibers, flow meters, sensors, measuring instruments
• Performance test test loop
After-Sales Services
More than 10 professional service engineers with rich on-site experience to provide timely services for customers all over the world. Training and supervisions for installation and commissioning, operation and maintenance, fault repair and other services. After-sales service center may also be arranged to cover nearby countries and areas.
Western Commitments
√ Response with solutions 8 hours after receiving customer notification for equipment failure.
√ Arriving at installation site within 48 hours after notification of damage (users in China).
√ Services engineers always ready for professional services 365 days a year.